Work has just started on a new car park in the UK.
On an area of 3,417 square meters we will build a raised floor, without digging, increasing the parking spaces from the current 158 to 293.
The project includes the installation of photovoltaic shelters with a peak power of 152.60 kWp. Of the 135 parking spaces we are about to add, 10 will be equipped with an electric charging station.
Efficiency, safety, sustainability, but also aesthetics. In fact, the car park includes an elaborate exterior cladding system made up of aluminum slats with variable inclination (brise soleil) on 3 elevations and a facade with climbing plants on the fourth elevation.
We can’t wait to show you the final result! Fortunately, considering how fast the work is proceeding, we won’t have to wait long.
We thank our partner Octavius Infrastructure Limited also for the filming.